Continued wire routing cleanup by changing power and ground wiring to combine wires that were previously in separate bundles. Changed routing of some GAD 27 and power and ground wires. Installed another Adele clamp to support power wires going to the fuse block and grounds. Decided to change positions of some of the fuses on the avionics fuse block due to the length of some of the wires to the fuse block. Completed about 1/2 of the wire connections to the aviation fuse block.